SPAIN

Alten Energías Renovables Iberia is currently managing, together with Grupo Ortiz, a 13MW project that has been up and running since late 2019 in El Casar (Guadalajara) and two further projects, of 50MW and 60MW, that are at an advanced stage of development, with construction planned to start in 2021. These projects are located in areas with high irradiation, close to major consumption centres, with the electricity infrastructure necessary to efficiently absorb the energy generated.