PORTUGAL | 90 MW | In Development

Alten Energías Renovables currently has two projects in the south of Portugal that jointly come to 90 MW Arraiolos 45 MWp and Aljustrel 45 MWp. The aim is to grow this portfolio to 200MW by the end of 2023.