SPAIN

Alten Energías Renovables Iberia is currently managing, together with Grupo Ortiz, a 13MW project that has been up and running since late 2019 in El Casar (Guadalajara) and three further projects that are at an advanced stage of development, with construction planned to start in 2023. These projects are located in areas with high irradiation, close to major consumption centres, with the electricity infrastructure necessary to efficiently absorb the energy generated.

Projects executed


Development projects

  • Meco Solar – 50 Mwp
  • Morata Solar –60 Mwp
  • Tres Cantos – 100 Mwp