SPAIN
Alten Energías Renovables Iberia is currently managing, together with Grupo Ortiz, a 13MW project that has been up and running since late 2019 in El Casar (Guadalajara) and three further projects that are at an advanced stage of development, with construction planned to start in 2023. These projects are located in areas with high irradiation, close to major consumption centres, with the electricity infrastructure necessary to efficiently absorb the energy generated.
Projects executed
- Guadalajara | El Casar | 13 MW
- Otros proyectos:
Project specifications
- Peak power: 8,41 MWp
- Country: España
- Borough (Province): Alange (Badajoz)
- Annual production: 16.605.900 kWh/year
- Technology: 1 axid solar tracker (Suncarrier)
- Modules: Suntech / Aleo / Solon
- Inverter: Kaco
- Transformer: 14 x 630 kVA
- Distribution company: Endesa
- Alten holding: 50% (rest of Ortiz Group)
- Start of operation: August 2008
- Other details: RD 661/2007
Project specifications
- Peak power: 7,49 MWp
- Country: España
- Borough (Province): Alconera (Badajoz)
- Annual production: 15.044.647 kWh/year
- Technology: 1 axid solar trackers (Suncarrier)
- Modules: Suntech / Aleo
- Inverter: Kaco
- Transformer: 12 x 630 kVA
- Distribution company: Endesa
- Alten holding: 50% (rest of Ortiz Group)
- Start of operation: August 2008
- Other details: RD 661/2007
Project specifications
- Peak power: 9,06 MWp
- Country: España
- Borough (Province): Alconera (Badajoz)
- Annual productionl: 14.267.618 kWh/year
- Technology: Fixed
- Modules: Yingli
- Inverter: Ingeteam
- Transformer: 8 x 1.000 kVA
- Distribution company: Endesa
- Alten holding: 50% (rest of Grupo Ortiz)
- Start of operation: Febrero 2010
- Other details: RD 1578/2008
Project specifications
- Peak power: 2,64 MWp
- Country: España
- Borough (Province): Hinojosa del Valle (Badajoz)
- Annual production: 5.674.918 kWh/year
- Technology: 2 axid solar trackers
- Modules: Conergy
- Inverter: Conergy
- Transformer: 5 x 630 kVA
- Distribution company: Endesa
- Alten holding: 100%
- Start of operation: February 2010
- Other details: RD 1578/2008
Project specifications
- Peak power: 1,98 MWp
- Country: España
- Borough (Province): Los Hinojosos (Cuenca)
- Annual production: 3.079.793 kWh/year
- Technology: 17 x 100 kW / Fixed 1 x 100 kW / 2 axid solar trackers
- Modules: Rec / Isofotón
- Inverter: Greenpower
- Transformer: 18 x 100 kVA
- Distribution company: Iberdrola
- Alten holding: 100%
- Start of operation: October 2007
- Other details: RD 661/2007
Project specifications
- Peak power: 3,09 MWp
- Country: España
- Borough (Province): Pozohondo (Albacete)
- Annual production: 6.016.928 kWh/year
- Technology: 1 axid solar trackers (Suncarrier)
- Modules: Aleo / Solon
- Inverter: Kaco
- Transformer: 30 x 100 kVA
- Distribution company: Iberdrola
- Alten holding: 100%
- Start of operation: September 2008
- Other details: RD 661/2007